Skip to product information
Smart GPS Pet Tracker Collar for Dogs and Cats – Waterproof Real-Time Location Device
$66.99 USD
Sale price
$66.99 USD
Regular price
$81.99 USD
Free Shipping
📝Description
Keep your pets safe anytime, anywhere with the G12P Smart 2G GPS Pet Tracker. This advanced tracking device uses multiple positioning systems including GPS, AGPS, BDS, LBS, and WiFi to provide accurate real-time location tracking.
Perfect for dogs and cats, this lightweight tracker easily attaches to a collar and allows you to monitor your pet’s movement directly from your smartphone.
With features like geofencing, SOS alerts, historical route tracking, and even remote listening, it ensures complete peace of mind for pet owners.
✨ Key Features
- 📍 Real-time GPS + AGPS + BDS + LBS + WiFi tracking
- 🛡️ IP67 waterproof & dustproof design
- 🔔 Geofence & safety zone alerts
- 🐾 Lightweight (only ~28g) – comfortable for pets
- 🎤 Remote listening via built-in microphone
- 📱 Mobile app tracking & multi-user support
- 🔋 500mAh battery with 5–10 days usage
- 🚨 SOS & low battery alerts
- 📡 Historical route playback
📦 Product Specifications
- Product Name: Smart Pet GPS Tracker
- Material: Plastic + Metal + Electronic components
- Size: 5.33 × 2.9 × 2.2 cm
- Battery: 500mAh polymer lithium
- Charging: Magnetic charging cable
- Charging time: ~2 hours
- Waterproof: IP67
- Positioning Accuracy: ~5 meters
- Network: 2G SIM required


















